Construction finance — from approval to final draw-down, managed for you
Construction loans don't work like standard home loans. Your lender releases funds in stages as your builder hits milestones — and the right structure from day one determines whether your build runs smoothly or stalls.
Construction loan basics
How construction loans actually work in Australia
A construction loan funds a new build — whether that's a house on vacant land, a knockdown-rebuild, or a house-and-land package. Unlike a standard home loan where the lender releases the full amount at settlement, a construction loan releases funds in stages as your builder completes each phase of the build. This is called the progress draw-down process.
During construction, you pay interest only on the amount drawn down — not the full loan. So if your total loan is $600,000 and only $90,000 has been drawn after the slab stage, you're paying interest on $90,000. Your repayments increase progressively as each stage is completed and more funds are released. Our loan repayment calculator can help you estimate what those staged payments look like.
Most lenders require a 20% deposit calculated on the total project cost — that's land plus construction combined. Some accept 10-15% with lenders mortgage insurance, but the added cost can be significant. If you already own the land or have equity in another property, that equity often counts toward your deposit. Use our borrowing power calculator for a quick estimate of where you stand.
At each stage, your builder submits a progress claim. The lender arranges an independent inspection or reviews the builder's progress report to confirm the work is complete before releasing the next payment. This process protects you — funds are only released for work that's actually been done.
QLD standard progress payment stages
| Stage | What happens | Typical % of contract |
|---|---|---|
| Deposit | Builder receives initial deposit upon signing the contract | 5% |
| Base/slab | Site preparation and concrete slab poured | 15% |
| Frame | Wall frames and roof trusses erected | 20% |
| Lock-up | External walls, windows, doors, and roof completed — building is enclosed | 20% |
| Fit-out | Internal plumbing, electrical, plastering, cabinetry, and tiling | 25% |
| Practical completion | Final finishes, fixtures, and site clean-up — ready for handover | 15% |
From first conversation to final draw-down — what to expect
Strategy call and position review
We start with a 30-minute call to understand what you're building and why. Are you building your own home, an investment property, or a dual-occupancy? Do you own the land already, or are you buying? This shapes the loan structure, lender selection, and timeline.
Pre-approval
Before you sign a building contract, you need to know what you can borrow. We assess your income, debts, and available equity, then secure a pre-approval that gives you a clear budget. This also tells your builder you're a serious buyer with finance in place.
Builder contract and council approval
Once you have plans, a signed fixed-price building contract, and council or DA approval, we can move to formal application. Your builder must hold a current QBCC licence in QLD. Lenders also require the "as if complete" valuation — an assessment of what the finished property will be worth based on your plans and specifications.
Formal approval and loan setup
We submit your full application with all supporting documents. Most construction loan approvals take 2-4 weeks at this stage. Once approved, the lender sets up your construction facility — a loan account structured for staged draw-downs rather than a single settlement amount.
Progress payments during the build
As your builder completes each stage (slab, frame, lock-up, fit-out, completion), they submit a progress claim. The lender inspects or reviews the work, then releases the funds. We manage this process for you — chasing inspections, coordinating with the lender, and making sure payments aren't held up.
Final draw-down and conversion
After practical completion and the final inspection, the last payment is released. Your construction loan then converts to a standard home loan — variable, fixed, or split, depending on how we've structured it from day one. For investors, this is where the post-construction loan structure matters most. We plan this at the outset, not as an afterthought.
What most people overlook about construction finance
Fixed-price vs cost-plus contracts
Lenders require a fixed-price building contract for almost all construction loans. A fixed-price contract locks in the total cost — your builder absorbs any overruns. Cost-plus contracts, where you pay actual costs plus a margin, are extremely difficult to finance because the lender can't determine the final loan amount. If your builder is pushing cost-plus, understand that your finance options shrink dramatically.
Owner-builder restrictions
If you're planning to manage the build yourself, your finance options are severely limited. Most mainstream lenders decline owner-builder applications outright. The few that consider them typically cap the LVR at 50-60% and require a QBCC owner-builder permit (mandatory for work over $11,000 in QLD), licensed tradespeople for all regulated work, and a quantity surveyor's report.
Deposit and equity requirements
Your deposit is calculated on the total project cost — land plus construction. If you already own the land, its current value counts toward your equity position. If you own another property with equity, you can use that as your deposit without selling. The structure of this equity release matters — get it wrong and you'll limit your borrowing capacity for the build itself.
Post-construction loan conversion
When the build is complete, your construction loan converts to a standard home loan. This conversion should be planned from day one, not figured out at the end. For investors, the post-construction structure — IO vs P&I, fixed vs variable, standalone vs linked — determines how the property fits into your broader portfolio and what you can borrow next.
Three mistakes we see in construction finance
Choosing a lender based on rate, not construction policy
The cheapest rate means nothing if the lender takes 10 business days to process each draw-down request, restricts variations, or requires invasive inspections that delay your build. Some lenders are genuinely good at construction — they process progress claims quickly, handle variations without drama, and have valuers who understand new builds. Others treat construction as an afterthought. The wrong lender can add weeks of delays and significant frustration to your build.
Not planning the post-construction loan structure
Most people focus entirely on getting the construction loan approved and give no thought to what happens after the build. But the post-construction loan structure — the rate, the repayment type, and how it sits alongside your other debts — is where the long-term cost lives. For investors, this is especially critical. An IO structure might preserve cash flow and borrowing capacity for the next purchase. A P&I structure might save interest over time. This should be decided upfront, not when the builder hands over the keys.
Signing a cost-plus contract without understanding the finance implications
Cost-plus contracts appeal to people who want flexibility during the build — the ability to upgrade finishes, change layouts, or adjust specifications as they go. The problem: most lenders won't fund them. Without a fixed total, the lender can't determine a loan amount, and the valuation becomes guesswork. If you've already signed a cost-plus contract and then approach a lender, you may find your options reduced to a handful of specialist or non-bank lenders with higher rates and stricter terms.
How we manage construction finance differently
Construction finance is one of our core specialties — and not because we settled a few building loans. As investors who've built ourselves, we understand the process from both sides: the finance and the build. That's why we don't just arrange your construction loan and walk away. We manage the entire draw-down process from first payment to final handover.
For every construction client, we select the lender based on how they actually handle construction — not just their headline rate. That means assessing draw-down processing times, variation policies, inspection requirements, and how the loan converts post-completion. With 50+ lenders on our panel, we know which ones make your builder's life easier and which ones create friction at every stage.
For investors building within a portfolio, we go further. We structure the construction loan so that the post-completion facility — the loan you'll hold long-term — is planned from day one. That means choosing the right repayment type, keeping the loan standalone (not cross-collateralised), and making sure the construction doesn't limit what you can borrow for your next purchase. Every decision is made with your broader position in mind.
“Jordan and his team made our home loan application process seamless, straightforward and importantly, stress free. We will use him again, I would recommend to anyone.”
This service is for you if…
- You're building a new home on vacant land or doing a knockdown-rebuild and need finance structured correctly from the start
- You're an investor building for rental yield or capital growth and want the construction loan to fit your portfolio strategy
- You've been quoted by a builder and need to understand your borrowing capacity before signing a contract
- You're considering an owner-builder approach and want honest advice on whether it's financeable
- You want a broker who'll manage the draw-down process during the build — not just arrange the loan and disappear
Not sure if this fits? Book a call and we'll help you work it out — no obligation.
Frequently asked questions
Yes. During the construction period, you pay interest only on the funds that have been released to your builder — not the full loan amount. As each progress payment stage is completed and funds are drawn, your interest charges increase incrementally. This keeps your repayments lower during the build.
With a fixed-price contract, your builder absorbs cost overruns — that's why lenders require them. If your builder becomes insolvent mid-build, QLD Home Warranty Insurance (mandatory for licensed builders) covers you for incomplete or defective work up to certain limits. You'll need to engage a new builder to complete the work, and the lender will reassess the remaining loan against the cost to complete.
It's possible but significantly harder. Most mainstream lenders decline owner-builder applications outright. The few that consider them typically cap the LVR at 50-60%, require a QBCC owner-builder permit, and need a full quantity surveyor's report. You'll also need to demonstrate licensed tradespeople are engaged for all regulated work. We know which lenders still consider owner-builder applications and what they require.
A fixed-price contract locks in the total build cost upfront — the builder wears the risk of cost increases. A cost-plus contract charges you the actual cost of materials and labour plus a margin, meaning the final price is unknown until the build is complete. Most lenders require a fixed-price contract because it gives them a defined amount to lend against. Cost-plus contracts are very difficult to finance through mainstream lenders.
Allow 4-8 weeks from application to formal approval, assuming you have council approval, a signed fixed-price building contract, and your plans and specifications ready. The first draw-down (deposit to your builder) can happen within days of formal approval. The construction period itself is typically 6-12 months for a standard residential build.
Yes. If you own property with sufficient equity, you can use it to fund your construction deposit without selling. The lender sets up a separate facility against your existing property to release the equity. This is common for investors building a second or third property. The key is structuring the equity release correctly so it doesn't compromise your existing loan or your borrowing capacity for the build.
Ready to get your construction finance sorted?
Book a free strategy call and we'll walk you through your options — from pre-approval to how we manage every draw-down stage of your build.
Book a Free Strategy CallIn most cases you pay nothing — we're paid by the lender.