What is a construction loan?

A construction loan is a home loan that releases funds in stages as your builder completes each phase of the build. Unlike a standard home loan — where the lender transfers the full amount at settlement — a construction loan drips money out progressively, aligned to the physical progress of your project.

This is the fundamental difference. A standard home loan is a single event: the lender sends the money, you own the property. A construction loan is a process. It runs for 6 to 12 months (sometimes longer for complex builds), and during that time you manage draw-downs, inspections, and builder payments alongside the lender.

How construction loans differ from standard home loans

There are four key differences.

First, you pay interest only on the amount drawn down, not the full loan. If you have a $650,000 construction facility but only $130,000 has been drawn so far, you pay interest on $130,000. This keeps repayments manageable during the build — but it also means your monthly costs escalate with each draw-down.

Second, the lender values the property on an "as-if-complete" basis before construction starts. A valuer assesses what the finished property will be worth based on plans, specifications, and comparable sales. This valuation determines your maximum loan amount and loan-to-value ratio.

Third, the lender must approve your builder. Your builder needs a current QBCC licence in Queensland, and some lenders require minimum trading history or run financial checks to assess insolvency risk. If your builder does not pass the lender's checks, you need to find a different builder or a different lender.

Fourth, the loan converts to a standard home loan after construction is complete. The construction phase is just the first chapter — the loan then reverts to principal and interest or interest-only repayments on the full amount, like any other mortgage.

What types of builds are covered

Construction loans cover new builds on vacant land, knockdown-rebuilds, house-and-land packages, and major renovations or extensions (typically $100,000+). Minor renovations under $100,000 are usually funded through a standard home loan redraw, personal loan, or home loan top-up rather than a formal construction facility.

How progress payments work: the draw-down process step by step

Progress payments are the mechanism by which your lender releases funds to your builder during construction. In Queensland, building contracts set out the payment stages (typically deposit, base, frame, lock-up, fixing and practical completion), the deposit is capped at 5% for domestic building contracts of $20,000 or more, and each progress claim must relate to work actually completed. This protects you from builders front-loading payments before the work is done.

The six stages

Stage Description % of contract Cumulative
Deposit Payment upon signing the building contract 5% 5%
Base/slab Site preparation, footings, concrete slab poured 15% 20%
Frame Wall frames erected, roof trusses installed 20% 40%
Lock-up External walls, windows, doors, roof complete — building is weatherproof 20% 60%
Fit-out Internal plumbing, electrical, plastering, cabinetry, tiling, painting 25% 85%
Completion Final finishes, fixtures, site clean-up, handover 15% 100%

These percentages are maximums under QBCC standard contracts. Your actual contract may specify slightly different splits, but the total must equal 100% and no single stage can be disproportionately front-loaded.

What happens at each draw-down

The process follows the same pattern at every stage.

Your builder completes the work for that stage and submits a progress claim to you (and to the lender). The lender arranges an independent inspection to verify the work matches the plans and is genuinely complete. An inspector visits the site, checks the work, and provides a report to the lender. If the inspection passes, the lender releases the funds — either directly to the builder or into a nominated account. Your builder receives payment and moves to the next stage.

If the inspection fails — because the work is incomplete, does not match the plans, or has quality issues — the lender holds the funds until the builder addresses the deficiencies and a follow-up inspection confirms completion.

Inspections: who pays and how long they take

You pay for the inspections. Typical costs are $150 to $300 per inspection, with five to six inspections across a standard build. Budget $750 to $1,800 for inspections across the entire construction period.

The draw-down processing time varies significantly by lender. Efficient lenders release funds within two to five business days of the inspection passing. Slower lenders can take seven to ten business days. This matters because your builder cannot start the next stage until they receive payment for the current one. A slow-processing lender adds weeks to your total build timeline.

The draw-down dollar trail: how interest accrues during construction

Every construction loan guide says "you only pay interest on the amount drawn down." That is true, but it is only half the picture. What none of them show you is exactly how much that interest adds up to across the full build. So here are the actual numbers.

Worked example: $650,000 build at 6.50%

Let's walk through a $650,000 construction project at an interest rate of 6.50% per annum. The build runs for approximately seven months across six draw-down stages.

Stage Draw-down Cumulative drawn Monthly interest Est. duration Interest this stage
Deposit (5%) $32,500 $32,500 $176 4 weeks ~$176
Base/slab (15%) $97,500 $130,000 $704 4 weeks ~$704
Frame (20%) $130,000 $260,000 $1,408 3 weeks ~$1,056
Lock-up (20%) $130,000 $390,000 $2,113 5 weeks ~$2,641
Fit-out (25%) $162,500 $552,500 $2,993 8 weeks ~$5,986
Completion (15%) $97,500 $650,000 $3,521 3 weeks ~$2,641
Total $650,000 — — ~27 weeks ~$13,204

Your monthly repayments start at $176 and end at $3,521. That is a twenty-fold increase over seven months. And the total interest paid during construction — approximately $13,000 to $15,000 — is a cost most borrowers do not budget for.

This is not wasted money. The progressive draw-down structure actually saves you significant interest compared to a standard home loan. If you borrowed $650,000 as a lump sum from day one and paid principal and interest, your monthly repayment would be approximately $4,100 from the start. The draw-down structure saves you roughly $15,000 in total repayments over the construction period compared to full-balance P&I.

But you still need to budget for the escalating monthly costs. Your repayments in months five and six will be substantially higher than months one and two. Factor this into your cash flow planning before you sign the building contract.

Note: this is an illustrative example. Actual interest varies based on the rate at each draw-down, exact stage durations, and the lender's calculation method. Some lenders calculate interest daily; others monthly. Your broker can model the precise figures for your project.

Fixed-price vs cost-plus contracts: what lenders require and why

Virtually every mainstream lender in Australia requires a fixed-price building contract before they will approve a construction loan. The reason is straightforward: the lender needs certainty about the total project cost to calculate the loan-to-value ratio and assess your borrowing capacity. A contract where the final price is unknown is a contract a lender cannot reliably assess.

What a fixed-price contract actually fixes

A fixed-price contract locks in the total construction cost based on detailed plans and specifications. The builder absorbs cost overruns — if materials prices rise or the job takes longer than expected, the builder wears the difference. This is why lenders prefer them: the risk of cost blowout sits with the builder, not with you or the lender.

But "fixed-price" does not mean every dollar is locked down. Two common elements introduce variability.

Provisional sums are allowances for work that cannot be accurately priced at contract stage — typically site preparation, soil conditions, or retaining walls on sloping blocks. If the actual cost exceeds the provisional sum, you pay the difference. If it comes in under, you save.

Prime cost items are allowances for fixtures and fittings you will select later — tapware, tiles, appliances, light fittings. The contract includes an allowance (say $5,000 for kitchen appliances), but if you choose a $9,000 range, you pay the $4,000 difference.

These hidden variables can add $10,000 to $30,000 to a "fixed-price" contract. Always review provisional sums and prime cost items with your broker and builder before signing.

The cost-plus problem

A cost-plus contract charges you the actual cost of labour and materials plus a builder's margin (typically 15% to 25%). The final price is unknown until the build is complete. Some builders prefer cost-plus because it eliminates their risk — every cost overrun is passed to you.

Most lenders will not finance a cost-plus contract. Those that do typically cap the LVR at 60% to 70% and require a quantity surveyor's estimate of total costs. For most borrowers, cost-plus contracts create severe financing problems and should be avoided unless you have a very specific reason and substantial cash reserves.

Variations during construction

Even with a fixed-price contract, changes happen. You might want to upgrade the flooring, add a gas point, or move a wall. These are called variations, and each one requires a formal variation order signed by you and the builder.

If a variation increases the total contract value, the lender must approve it. This can add one to two weeks to the draw-down timeline for that stage. Your broker can advise on which lenders handle variations most efficiently.

What you need before you apply

Construction loan applications require more documentation than a standard home loan. The lender needs to assess not just your ability to repay, but the viability of the entire construction project. Here is what you need to have ready.

Plans and specifications

You need design-ready plans — not concept sketches. The plans must be detailed enough for the lender's valuer to assess the finished property. This includes floor plans, elevations, site plans, and a full specification document listing materials, fixtures, and finishes.

Council or DA approval

Most lenders require full development application (DA) approval before they will issue unconditional loan approval. Lodgement alone is not enough — the lender wants certainty that the build can legally proceed.

In Queensland, a standard DA takes 20 to 40 business days. Complex applications involving flood overlays, heritage restrictions, or multi-dwelling developments can take three to six months. Using a private certifier for building approval (as opposed to council) can reduce the approval timeline to two to four weeks for straightforward builds.

A signed fixed-price building contract

The contract must be signed by you and your builder. It must detail the total construction cost, payment stages, estimated timeline, and inclusions. The lender will review the contract as part of their assessment.

Builder with a current QBCC licence

In Queensland, your builder must hold a current QBCC licence appropriate to the class of building work. You can verify a builder's licence status on the QBCC online register. Some lenders also require minimum trading history — two to three years is common — and may run financial checks on the builder to assess insolvency risk.

Standard loan application documents

The same documents as any home loan: income evidence (payslips, tax returns, financial statements for self-employed borrowers), asset and liability statements, identification documents, and details of existing debts and commitments.

The as-if-complete valuation

The lender will order a valuation based on your plans, specifications, and comparable sales of finished properties in the area. This determines the maximum loan amount. If the valuation comes in lower than expected, you have three options: fund the gap with additional cash, reduce the scope of the build to lower the total cost, or find a lender whose valuer assesses the property more favourably. Your broker can advise on which valuers and lenders are most appropriate for your build type and location.

Land and construction vs standalone: understanding the two scenarios

Construction finance works differently depending on whether you are buying land and building, or building on land you already own. Each scenario has a different loan structure, deposit calculation, and timeline.

Buying land and building

This is the most common scenario for first-time builders. The loan has two stages: the land purchase settles first, with the lender releasing funds to cover the land price. Once the land is in your name, the construction facility activates and draw-downs begin as the builder hits each progress milestone.

Some lenders structure this as a single loan with two components. Others require two separate loans — one for the land and one for the construction. The single-loan approach is simpler to manage but gives you less flexibility to choose different lenders for each component.

The deposit is calculated on the total project cost — land plus construction. If you are buying a $350,000 block and building a $400,000 home, the total project cost is $750,000. A 20% deposit on that is $150,000.

There is a significant stamp duty advantage here. In Queensland, if you buy vacant land and build, stamp duty is payable on the land purchase price only — not the completed property value. On a $350,000 land purchase, stamp duty at the general rate is approximately $10,675. If you bought an equivalent completed home for $750,000, stamp duty at the same rate would be approximately $26,775. That is a saving of more than $16,000. (Eligible first home buyers pay no stamp duty on vacant land to build their first home or on a new home, for contracts signed from 1 May 2025.)

Building on land you already own

If you already own the land — either outright or with an existing mortgage — the construction loan is a standalone facility. The equity in your land counts toward the deposit. If your land is valued at $400,000 and you owe $200,000 on it, you have $200,000 in equity. At 80% LVR, your usable equity is ($400,000 x 0.80) - $200,000 = $120,000.

This is the simplest scenario to finance because the land component is already settled. You skip the two-stage structure entirely and go straight to construction draw-downs.

Knockdown-rebuild

With a knockdown-rebuild, the existing property is demolished before construction begins. Some lenders require evidence of demolition — typically a certificate from the demolition contractor — before they release construction funds. The land value post-demolition is your starting equity.

This scenario can be more complex to finance because the property's value drops from "existing house" to "vacant land" during demolition. Your lender needs to be comfortable with this temporary reduction in security value.

Owner-builder finance: an honest assessment

Owner-building — where you manage the construction project yourself rather than engaging a licensed builder — can save 15% to 25% on the builder's margin. On a $650,000 build, that is $97,500 to $162,500 in potential savings. But the finance reality is sobering.

Most lenders say no

The majority of mainstream lenders — including the Big 4 banks and most major non-banks — decline owner-builder applications outright. The lenders who consider them typically cap the LVR at 50% to 60%. On a $650,000 build with $350,000 land (total project: $1,000,000), a 50% LVR means you need $500,000 in cash or equity. That is not a first home buyer scenario.

The lenders who do consider owner-builders are typically credit unions, smaller non-banks, and specialist lenders. The interest rates are usually higher and the terms more restrictive.

What you need as an owner-builder in QLD

In Queensland, residential building work valued over $11,000 requires a QBCC owner-builder permit. To get the permit, you must complete an approved owner-builder course. You must also provide evidence that all regulated work — electrical, plumbing, gas fitting, waterproofing — will be performed by licensed trades. The lender will typically require a quantity surveyor's report, a detailed construction schedule, and evidence of project management capability.

The six-year resale restriction

This is the fact that changes the investment calculus for owner-builders in Queensland. If you build as an owner-builder and sell the property within six years of completing the work, you must give the buyer a written owner-builder notice before they sign the contract, warning that the work is not covered by QBCC insurance. The buyer is then on notice that the work was not performed by a licensed builder, which can affect the property's value and insurability.

For owner-occupiers who plan to stay put for a decade, this restriction is irrelevant. For investors who might need to sell or restructure within six years, it is a dealbreaker.

When it makes sense (and when it does not)

Owner-building makes financial sense when you have substantial equity or cash, construction management experience, and no intention of selling within six years. It does not make sense when you are relying on a high LVR, have no building experience, or might need to sell the property in the medium term.

The 15% to 25% builder margin saving sounds compelling, but weigh it against the higher deposit requirement, higher interest rate, more restrictive loan terms, and the six-year resale lock-in. For most borrowers, engaging a licensed builder is the more practical path — even if it costs more upfront.

After the build: loan conversion and what comes next

Your builder hands over the keys. The final draw-down is processed. Construction is complete. Now what?

How the loan converts

At most lenders, the construction loan automatically converts to a standard home loan once the final draw-down is processed and the lender confirms practical completion. The full loan balance — $650,000 in our worked example — now becomes a standard mortgage.

The default post-construction structure is typically a variable rate with principal and interest repayments. But you are not locked into this. At conversion, you can usually choose to fix part or all of the loan, split the loan between fixed and variable, or switch to interest-only repayments if you are an investor and the lender's policy allows it.

Some lenders require a refinance to change the loan structure at conversion. Others allow you to adjust within the existing facility. Your broker should confirm this before you select a lender — the conversion flexibility is a factor worth considering at the outset, not at completion.

The rate trap

Some lenders offer competitive interest rates during the construction period to win the deal, then revert to a higher standard variable rate post-completion. The construction rate might be 6.30%, but the post-construction variable reverts to 6.70%. On a $650,000 loan, that 0.40% difference costs an extra $2,600 per year.

Ask your broker to confirm the post-construction rate before you commit. The construction rate means nothing if the ongoing rate is uncompetitive.

For investors: why post-construction structure matters

If you are building an investment property, the post-construction loan structure should be decided at loan setup — not after the build is complete. The key decisions are:

Interest-only or principal and interest. IO preserves cash flow and maximises tax-deductible interest. P&I builds equity faster. For most investors, IO for the first five years post-construction aligns better with a growth-focused strategy.

Standalone or linked. Keep the construction loan standalone — not cross-collateralised with existing properties. This protects your borrowing capacity and portfolio flexibility.

Fixed, variable, or split. Fixed provides repayment certainty. Variable offers flexibility and typically allows unlimited extra repayments. A split gives you both.

Depreciation. Australian tax law allows building allowance deductions (Division 43, generally 2.5% per annum over 40 years) and plant and equipment deductions (Division 40, at varying rates). The deductions available on any given build are set out in a quantity surveyor's depreciation schedule, and how they affect your tax depends on your circumstances. This is general information, not tax advice — confirm your position with a registered tax agent.

Twelve months after practical completion, book a loan review. Construction rates and post-construction structures can shift quickly. An annual review ensures your rate is competitive and your structure still serves your goals.

Frequently asked questions

Most mainstream lenders require a 20% deposit calculated on the total project cost — land plus construction. If you are buying a $350,000 block and building a $400,000 home, the total project cost is $750,000 and a 20% deposit is $150,000. Some lenders allow 10% or even 5% deposits with lenders mortgage insurance, and the First Home Guarantee can reduce the deposit requirement further for eligible first home buyers. Your broker can model the exact deposit needed for your scenario across multiple lenders.

It is possible but very difficult. Most mainstream lenders — including the Big 4 banks — decline owner-builder applications outright. The lenders who consider them typically cap the LVR at 50% to 60%, require a QBCC owner-builder permit, a quantity surveyor's report, and evidence that all regulated trades will be performed by licensed professionals. In Queensland, owner-builders also face a six-year resale restriction. For most borrowers, engaging a licensed builder provides a significantly smoother finance pathway.

With a fixed-price contract, cost overruns are the builder's responsibility — they absorb the difference. If your builder becomes insolvent mid-build, Queensland Home Warranty Insurance covers defective or incomplete work up to $200,000 per dwelling. The insurance covers structural defects for 6 years and 6 months and non-structural defects for 12 months from completion. Your broker and conveyancer can help you navigate the process of engaging a new builder and restructuring draw-downs with your lender.

You do. The borrower pays for each progress inspection, which typically costs $150 to $300 per inspection. With five to six inspections across a standard build, budget $750 to $1,800 in total inspection costs. Some lenders include the first inspection at no cost, but this is not standard. Inspection costs are separate from your loan and are paid directly to the inspection provider.

Yes. If you own an existing property with sufficient equity, you can use that equity as the deposit for a construction loan without selling the property. The usable equity is calculated as 80% of the property's current value minus the outstanding loan balance. For example, a property valued at $800,000 with a $400,000 loan balance has $240,000 in usable equity. Structure the construction loan as standalone security — not cross-collateralised with your existing property — to maintain portfolio flexibility.

Realistically, 12 to 24 months from initial application to moving in. The breakdown: loan application and approval takes 4 to 8 weeks (including the as-if-complete valuation), construction itself takes 6 to 12 months for a standard residential build, and post-construction conversion and settlement takes 2 to 4 weeks. Volume builder house-and-land packages tend toward the shorter end. Custom builds on complex sites can extend to 18 to 24 months or longer. Weather delays (particularly the Gold Coast wet season from December to March), material supply issues, and lender draw-down processing times all affect the timeline.

Get Your Free PDF Guide

Get the complete construction finance guide with all progress payment tables, draw-down examples, and checklists in a print-ready PDF — free, instant access.

Your information is secure. We respect your privacy. Privacy Policy

Planning a build? Let's map the finance.

Whether you are buying land and building, building on existing land, or exploring a knockdown-rebuild, a 15-minute strategy call will give you clarity on your borrowing capacity, lender options, and the draw-down process. In most cases you pay nothing, and there's no obligation.

Book a Free Strategy Call

In most cases you pay nothing — we're paid by the lender